WAPR

Worldwide AI Proliferation Registry
facility register built 2026-11-01
build …latest run build f7813e9identity detector v4condition rules WCI-1
Facility record · OpenStreetMap

Digital Realty ORD10

OSM node/10910879064 · operator tag: Digital Realty

WAPR is a public register of where AI computing physically sits. This page is one building that volunteers have mapped as a data centre — the map records what kind of building it is, not what runs inside it, so it may host AI, cloud or ordinary corporate servers. Everything below comes from OpenStreetMap, the volunteer-made public map, and is republished as recorded — including the operator tag, which is what mappers entered rather than a check of who runs the building today. Fields nobody recorded are shown as “not recorded”, never guessed. What WAPR is →

region
IL
address
350, East Cermak Road, Chicago
start date (OSM)
not recorded
coordinates
41.853351, -87.618307
OSM object
node/10910879064
OSM tag
telecom=data_center
feed checked 2026-11-01 09:17 UTC

This record is what OpenStreetMap contributors have mapped and tagged as a data centre — nothing more. WAPR republishes it verbatim with provenance; fields the mappers did not record are shown as such, never inferred.

WAPR id
WAPR-US-001447

What the public record says

feed checked 2026-09-14 05:15 UTC (oldest of 6 instruments)
how this is known as old as the oldest of Mapped facilities, Interconnection facilities, Crane filings, Virginia regulated sites, Permitted water discharge, Generators at sites (EIA-860M/923)

Each line is a public document that marks a step in this site’s life — a rung, in the register’s terms — with its date and what kind of date it is: the document’s own, a state the record shows already held on that date, or the day WAPR first saw the record.

  1. 2020-01on or beforea generator within 250 m produced power — EIA-923 monthly net generation (first month with output) for the EIA-860M plant within 250 m of the site (73 m from the pin)
    MPEA Energy Center · Petroleum Liquids · 4 MWh from 2025-01 to 2025-12
    EIA-923 series opens at the query's first month (2015-01); output before it is not in the series; EIA-860M lists a generator operating from 2010-03, before the first month with reported output (2020-01)
    figures restated 2026-10-22: previously mwh last 12 0; window 12 {"calendar_months_spanned":12,"from":"2024-01","months_in_window":12,"to":"2024-12"}
  2. 2026-09-15first seenmapped — OpenStreetMap object, first minted into the WAPR register

The register’s rungs are: mapped · listed in the network registry · crane notices filed beside it · on an air regulator's books · holds a discharge permit · generators recorded emitting · a generator within 250 m produced power · interconnection · operating load. Rungs not shown for this site are rungs no public document has put it on. Interconnection and operating load are never written until a primary record exists.

Where it sits

feed checked 2026-11-02 03:29 UTC data each map layer as its publisher served it when fetched, 2026-09-15 to 2026-11-01
retail utility territory
COMMONWEALTH EDISON CO · investor ownedholding company (HOLDING_CO) EXELON CORPcustomers (CUSTOMERS) 4,111,175layer vintage 2023-08
nearest transmission line of 230 kV or more
3,137 m · 345 kV · COMMONWEALTH EDISON CO
principal aquifer (regional aquifer system)
Silurian-devonian Aquifers (Carbonate-rock)
nearest named waterway
Chicago Sanitary and Ship Canal · 1,484 m

Sources

Straight-line joins to federal layers: HIFLD transmission and retail service territories (2023 vintage), USGS principal aquifers (1:2.5M), USGS NHD named flowlines. They say what surrounds the site, never what it draws, pumps or discharges. A territory says who sells retail power there; a line passing a site is not a line serving it.

Air permit

feed checked 2026-11-01 09:18 UTC data permit status as EPA's ECHO held it on 2026-11-01

No air-permit source is linked to this site; 2 within 137 m are credited to 2 other mapped sites. Each source is credited to one mapped site, so one that covers this site may be listed under a neighbour. WAPR reads only the ICIS-Air sources a state has coded NAICS 518210 or SIC 7374, so this is not proof the site has no permit.

Not this site's records — within 500 m of it, not linked to it

IL000031600GOJ
FIDELITY INFORMATION SERIVCES · within 28 m · credited to WAPR-US-001449
IL000031600GKH
350 EAST CERMAK ROAD A LLC · within 137 m · credited to WAPR-US-001450

Emissions on record

feed checked 2026-11-02 03:25 UTC data emissions in inventory year 2023 · ended 2023-12-31 fetched 2026-09-15

No NEI 2023 facility that WAPR's filter reads as a data centre lies within 500 m of this site. 2,889 point facilities in Illinois are in the 2023 file, 2,338 with state, local or tribal agency data, 16 of them read by WAPR's filter as data centres with NOx. ICIS-Air lists 41 Illinois sources under the data-processing codes, 27 carrying an EIS id, 13 of those ids in this file. The file does not say whether a site missing from it fell below the reporting threshold or was not submitted, and WAPR reads only the facilities its filter selects — the filter is under How this is known.

How this is known

WAPR's filter for the inventory file: primary NAICS code 518210, or a site name matching DATA ?CENT (case-insensitive)

Water discharge

feed checked 2026-11-01 09:21 UTC data monitoring periods from 2025-10-31 to 2026-10-31 fetched 2026-11-01

No discharge permit coded to the data-centre sector within 500 m. Most cooling water leaves as vapour and to the sewer, not through an outfall, so a site with no discharge permit on record is not a site that uses no water.

Generators within 1 km (EIA)

feed checked 2026-11-02 03:29 UTC data generators as listed in EIA-860M for 2026-08; output from EIA-923 over the last 12 months EIA's data service returned for each plant, windows ending between 2022-12 and 2026-08 — each plant's months are printed on its row · ended 2026-08-31 fetch time not stated
plant 55067
MPEA Energy Center · Metropolitan Pier and Exposition Auth · 3 generator(s) · Petroleum Liquids · 6 MW nameplate · first operating 2010-03 · 4 MWh from 2025-01 to 2025-12 (capacity factor 0) · EIA plant (73 m)

Sources

  • Form EIA-860M, monthly generator inventory (US Government work — public domain)
  • Form EIA-923, monthly net generation and fuel (US Government work — public domain)

Grid-connected generators of 1 MW or more within 1 km, from Form EIA-860M, with monthly output from Form EIA-923. Standby gensets that show 0 MWh did not run. Islanded plants are absent by rule — they are not obliged to file.